24 hour emergency call-out across Mansfield & Notts

Free quotes · No call-out charge · Fixed prices in writing

A completed slate re-roof in Mansfield

Updated for 2026

What Roofing Work Actually Costs

Real indicative prices for the Mansfield and Nottinghamshire area — published openly so you can sanity-check any quote you are given, including ours.

The table

Indicative costs, Mansfield & Nottinghamshire.

These are the ranges we quote within, for typical domestic properties, including VAT-free labour where applicable and standard access. Your roof may fall outside them — that is what a free inspection is for.

JobTypical rangeNotes
Replace a few slipped or broken tiles £150 – £450 Single visit, ladder access where safe
Re-bed or dry-fix a ridge line £450 – £1,200 Depends on ridge length and access
Chimney re-flash in new lead £400 – £900 Per stack, scaffolding extra if needed
Chimney repointing £450 – £1,100 Above roof line, including flaunching
Lead-lined valley renewal £600 – £1,500 Per valley, by length
Gutter clean and re-fall £90 – £220 Typical semi, includes downpipes
Full UPVC roofline replacement £1,400 – £2,600 Fascia, soffit and gutter, three-bed semi
Roof moss removal and treatment £450 – £900 Hand removal plus biocide softwash
Flat roof — EPDM rubber, single garage £1,600 – £3,000 Including new deck where needed
Flat roof — GRP fibreglass, single garage £2,000 – £3,800 Including new deck where needed
Re-roof — concrete tile, three-bed semi £5,500 – £9,000 Full strip, membrane, battens, dry ridge
Re-roof — natural slate, three-bed semi £9,000 – £16,000 Full strip, membrane, battens, dry ridge

Figures are guidance for typical two-storey domestic properties in our coverage area and assume standard access. Scaffolding, complex roof shapes, restricted access and unforeseen timber repair all move them. The only binding figure is a written quotation.

What drives the price of a roof

Access. This is the single biggest variable and the one homeowners consistently underestimate. Scaffolding on a modest semi runs £900 to £2,000 depending on how many elevations need it and how long it stands. A bungalow you can reach from a tower is far cheaper to work on than a three-storey Victorian terrace with no rear access, even though the roof area may be similar.

Roof area and shape. Price per square metre falls as area rises, so a large simple roof is better value than a small complicated one. Every valley, hip, dormer and change of pitch adds labour and adds a detail that has to be weathered correctly. A plain gable roof is the cheapest thing in roofing; a cut-and-stack roof with three dormers and two valleys is a different job entirely.

Materials. Concrete interlocking tile is the economical baseline. Clay plain tiles cost more and take considerably longer to lay because there are far more of them per square metre. Natural slate is the premium option; fibre-cement slate gets close to the look for meaningfully less. Lead is priced as a commodity and moves with the market.

What is underneath. Until the covering comes off, nobody knows the state of the rafter feet and the battens. A good quote handles this by stating a rate for timber replacement rather than assuming none — and by telling you honestly that it is a possibility rather than springing it on you on day three.

How to compare two quotes properly

Put them side by side and check these six things before you look at the totals. Is scaffolding included or excluded? Is the underlay being replaced, and with a breathable membrane or bitumen felt? Are the battens new and treated, or is the quote reusing the existing ones? Is the ridge dry-fixed or bedded in mortar? Is there a rate stated for replacing rotten timber? And is waste removal included?

Two quotes that differ by £2,000 usually differ on three or four of those six points. Once you have matched the specifications, the remaining difference is the actual price difference — and it is normally far smaller than it first appeared.

Warning signs on a quote

  • A large cash deposit requested before any work begins.
  • A price given over the phone without anyone seeing the roof.
  • Pressure to decide today, or a discount that expires this week.
  • "We were working next door and noticed your roof" — almost never true.
  • A single line reading "roof works" with no specification behind it.
  • No written quotation at all, only a figure agreed verbally.

Is roofing work VAT-free?

Generally no. Repairs and maintenance to existing dwellings carry VAT at the standard rate where the contractor is VAT registered. There are narrow exceptions — new-build housing is zero-rated, some conversions and properties empty for over two years attract a reduced rate, and certain energy-saving installations qualify. If a quote is materially cheaper because it is quoted without VAT, make sure you know which of those applies before you assume it is a saving.

Straight answers

Questions about roofing costs

Why do roofing quotes vary so much for the same job?

Three legitimate reasons and one illegitimate one. Legitimately: access and scaffolding can be a third of the cost and vary enormously between properties; material specification differs hugely — a dry-fix ridge and a mortar-bedded ridge are not the same product; and scope differs, because one quote may include replacing the underlay and battens while another only replaces tiles. Illegitimately: some firms price on what they think you will pay. Comparing quotes properly means comparing the specification line by line, not just the total at the bottom.

What is the biggest hidden cost in a roofing job?

Scaffolding, almost always. On a modest domestic re-roof it can account for £900 to £2,000 of the total, and a quote that excludes it is not comparable with one that includes it. Always check whether access is in the price. The second most common is timber repair — you cannot know how many rafter feet have rotted until the covering comes off, so a good quote states a rate for replacing them rather than pretending none will be needed.

Should I always get three quotes?

Get at least two, and treat anything dramatically cheaper than the others with suspicion rather than delight. A quote 40% below the rest usually means a different specification — mortar instead of dry fix, no new underlay, reusing old battens — or a firm that intends to find extras once the scaffolding is up. Ask each of them to itemise, and compare the specifications rather than the totals.

Do you ask for money up front?

We do not take deposits for repairs. On larger jobs where we are ordering materials specifically for your property, a materials payment on delivery is normal industry practice, with the balance on satisfactory completion. Nobody should ever be asking for a large cash payment before any work has started — that is the single clearest warning sign in this trade.

Are these prices guaranteed?

No — they are honest indicative ranges to help you sanity-check any quote you are given, ours included. Material costs move, particularly lead, and every roof is different. The only figure that binds us is a written quotation issued after we have seen the job, and those we hold for 30 days.

No obligation, no call-out charge

Get a straight answer about your roof.

We will look at it, tell you what is actually wrong, and put a fixed price in writing. If it needs a repair rather than a replacement, we will say so.

Call 01623 454545 Free quote